Wagenborg
Sign of Solutions Get Adobe Flash player
Follow Wagenborg on LinkedIn

Infrastructure

As the logistics heart of Europe, the Netherlands invests significant sums in improving rail, road, and water connections. Clients employ Wagenborg Nedlift on the basis of our experience and expertise. We work on:


Rail

Work on railway connections is subject to exceptional standards. An entire project needs to be completed within an extremely short period of time. Wagenborg Nedlift has the in-house knowledge and experience to take this on. 

 

Road

Infrastructure projects increasingly use a brief road closure, whereby an enormous amount of work is to be completed within an exceptionally short period of time. Driving on or moving off bridge parts and viaducts and placing prefab concrete girders is grist to the mill at Wagenborg Nedlift. For example, on the A7 Sneek ringroad, a unique wooden bridge was put into place in one go.


Water

As part of Royal Wagenborg we benefit from more than a hundred years of expertise in the area of shipping and other ‘water expertise’ within our parent company. Our unique combination of professional expertise in various fields guarantees you intelligent, creative, and optimum solutions.


 

Projects


Project title: Julianaplein bridges


Julianaplein A7 Groningen - local transport of 2 x 700 tonne bridge parts from motorway A7 Julianaplein to demolition site. Transport with SPMT during weekend closure.


Project title: Wooden bridge on wheels


Project Wooden Bridges A7 Sneek. Logistics partner for building and placing the biggest wooden bridge in the Netherlands, the Akkerwinde bridge at A7 Sneek. The job included lifting works for the assembly of the wooden bows, lifting the 2 bows of 130 tonnes each onto the bridge deck with 6 mobile cranes of 250-650 tonne capacity, and the final transport from the construction site to foundations across highway A7 with SPMTs


Project title: Jan Wils bridge Amsterdam


Transporting and placing the new Jan Wils bridge Amsterdam, which is 68m long and weighs 220 tonnes. Transport from manufacturing hall to quayside, loading onto barge with mobile cranes, water transport to Amsterdam, manoeuvring on project site, and jacking operation to place the bridge on its foundations.


Project title: Lage Erfbridge Rotterdam


Transport of 2 bridge parts of 125 tonnes each from the manufacturing shop in Middelburg (NL) to the project site at Delfshaven, Rotterdam. Placement onto foundation with 500 tonne and 650 tonne mobile crane.


Project title: VLARK railway project


Extension of the Amsterdam – Utrecht railway. Wagenborg Nedlift took care of lifting and assembling 600 concrete beams.