Wagenborg
Sign of Solutions Get Adobe Flash player
Follow Wagenborg on LinkedIn

Journey along river Rhine

Transport of a 410 tonne transformer from the manufacturing shop in Bad Honnef (DE) to the construction site of new KW Walsum (DE). Transport outside the hall to quayside, roll-on onto barge, barge transport to KW Walsum, roll-off operation, transport to site, unloading with gantry system, and placement onto foundation