Journey along river Rhine
Transport of a 410 tonne transformer from the manufacturing shop
in Bad Honnef (DE) to the construction site of new KW Walsum (DE).
Transport outside the hall to quayside, roll-on onto barge, barge
transport to KW Walsum, roll-off operation, transport to site,
unloading with gantry system, and placement onto foundation