New power for BF power plant Ghent
Transport of a turbine, condensers, and other ODC and break-bulk
from various shops in Europe to new building site BFG Ghent.
Transport of a 320 tonne generator from the port of Antwerp by
barge to Ghent, roll-off operation in Ghent, and transport to site
with SPMT. Execution period: Nov 08-Feb 09