Shutdown BP Lingen

Shutdown 2006 - carrying out all transport and lifting works during the 3 week shutdown in September 2006, including shutdown management, co-ordination, and engineering. Wagenborg Nedlift carried out the vertical and horizontal transport for the 4 main contractors and various subcontractors with an average of 40 cranes on site.