The Finland Connection
Transport of 21 heater modules with a weight of 100 - 400 tonnes
from Gdynia (Poland) to Fortum Refinery, Porvoo (Finland). The
project comprised transport to the quay at Gdynia, loading onto
pontoons and sea-going ships, unloading the ships at Porvoo, road
transport over 3.5km to site, and installation on the foundation at
the refinery.