In November 2007, Wagenborg Nedlift arranged the transport of two heavy transformers, 330 and 266 tonnes, from Linz (Austria) to the foundation at substation Diele (Germany). To reach the site of substation Diele, a bridge had to be passed that could not carry the huge weight of these transformers. Wagenborg Nedlift took care of engineering and constructing a special modular temporary steel bridge construction which was installed across the weak bridge. By means of skidding, both transformers were moved across the temporary bridge, thus preventing any forces and transport damage to the existing bridge. In January 2008, the 2nd phase of this project was carried out, which was similar to the first phase