Wagenborg
Sign of Solutions Get Adobe Flash player
Volg Wagenborg op LinkedIn

Journey along river Rhine

Transport of a transformer, 410 tons, from fabrication shop in Bad Honnef, DE to the construction site of new KW Walsum, DE. Transport outside the hall to quayside, roll-on onto barge, bargetransport to KW Walsum, roll-off operation, transport to site, offloading with gantry system and placement onto foundation