Journey along river Rhine
Transport of a transformer, 410 tons, from fabrication shop in
Bad Honnef, DE to the construction site of new KW Walsum, DE.
Transport outside the hall to quayside, roll-on onto barge,
bargetransport to KW Walsum, roll-off operation, transport to site,
offloading with gantry system and placement onto foundation