Wagenborg
Sign of Solutions Get Adobe Flash player
Volg Wagenborg op LinkedIn

New power for BF powerplant Gent

Transport of a turbine, condensors and other ODC and general cargo from various shops in Europe to new building site BFG Gent. Transport of generator 320 tons from port of Antwerp by barge to Gent, roll-off operation in Gent and transport to site with SPMT. Execution period nov08-feb09