Wagenborg
Sign of Solutions Get Adobe Flash player
Volg Wagenborg op LinkedIn

Transformers on the move

In November 2007, Wagenborg Nedlift arranged the transport of two heavy transformers, 330 and 266 tons, from Linz Austria up to foundation at substation Diele ,Germany. To reach the site of substation Diele, a bridge had to be passed that could not carry the huge weight of these transformers. Wagenborg Nedlift took care of engineering and construction of a special modular temporary steel bridge construction which was installed across the weak bridge. By means of skidding, both transformers were moved across the temporary bridge, thus preventing any forces and transport damage to the existing bridge. In Januari 2008, the 2nd phase of this project was executed, similar to the first phase