In November 2007, Wagenborg Nedlift arranged the transport of
two heavy transformers, 330 and 266 tons, from Linz Austria up to
foundation at substation Diele ,Germany. To reach the site of
substation Diele, a bridge had to be passed that could not carry
the huge weight of these transformers. Wagenborg Nedlift took care
of engineering and construction of a special modular temporary
steel bridge construction which was installed across the weak
bridge. By means of skidding, both transformers were moved across
the temporary bridge, thus preventing any forces and transport
damage to the existing bridge. In Januari 2008, the 2nd phase of
this project was executed, similar to the first phase