On Thursday the 5th of December, Wagenborg lifted a water injection system, measuring 150 meters, in a trench adjacent to the drilling hole. This project at the NAM-site in Borgsweer, near Delfzijl, was executed with 5 x 100 tonnes mobiles cranes. This (Dutch) video gives an impression af the lifting operation.

Share this page