News

22 August 2018 Visit us at ONS 2018 in Stavanger

From August 27th until August 30th 2018 ONS 2018 will take place at the Stavanger Forum, Stavanger in Norway. ONS 2018 is one of the the largest offshore exhibitions in Europe.

Read more

20 August 2018 m.v. Nassauborg discharged timber in Alexandria

Recently the m.v. Nassauborg discharged timber in the port of Alexandria.

Read more

10 August 2018 m.v. Amstelborg delivers wind turbines at the Great Lakes

Recently the m.v. Amstelborg arrived fully loaded with wind turbine components at Thunder Bay in Canada after an Atlantic crossing.

Read more

06 August 2018 Onego Trader sold and delivered

As of August 6th, the m.v. Onego Trader has been sold and delivered to her new owner.

Read more

19 July 2018 m.v Arubaborg draws attention in Green Bay

Recently, the Port of Green Bay has welcomed a new, large visitor that's expected to become a more common sight on the Fox River. The m.v. Arubaborg, measuring 143 meter in length,  arrived at KK Integrated Logistics's riverside warehouse with a load of wood pulp and newspaper rolls from Itaqui, Brazil.

Read more

13 July 2018 m.v. Taagborg destined for Deception Bay

Recently the m.v. Taagborg arrived at Deception Bay in Canada after a voyage with several port calls for loading and discharging big bags and wind turbine components.

Read more

06 July 2018 Weekly shipments wind turbine components to Piteå

Wagenborg Shipping Sweden was awarded a contract with General Electrics for the transport of several wind turbine components between Terneuzen and Piteå. The shipments is part of the Markbygden project which is, once it is completed, a windmill park consisting of over 1100 wind turbines just outside of Piteå.

Read more

04 July 2018 First Polar Code Certificate

The ice-classed vessel Taagborg has become the first Wagenborg ship - and one of the first Dutch flagged ships in the world - to receive the Polar Ship Certificate.

Read more

03 July 2018 Wagenborg orders a second Barge Master 3D motion compensated crane

Wagenborg has awarded Barge Master with a contract for a second 3D motion compensated crane to be installed on their new walk-to-work vessel the Kasteelborg. The fact that Wagenborg and Shell/Nam have selected Barge Master for an additional BM-T40 motion compensated crane showcases the success of the first one, which was installed on the state-of-the-art Walk-to-Work vessel Kroonborg.

Read more

Read more about our work in TIMES magazine

Times #23 (2024)

Download PDF version 

(File size: 5,64 MB)

 

Table of contents:

  • A conversation with Offshore director Edwin de Vries about the new KINGSBORG: “contract-based offshore is the future!”

  • 125 years of Wagenborg in pictures

download file

Times #22 (2023)

Download PDF version 

(File size: 4,11 MB)

 

Table of contents:

  • In conversation with Rob Wagenborg about growing up in a family business
  • Choices in the Wadden area: "Do you adapt the environment on ships or the other way around?"

download file

Times #21 (2022)

Download PDF version 

(File size: 6,10 MB)

 

Table of contents:

  • Why working at a family business is interesting!
  • “Working relationships between employer and employee are about love and loyalty.”

download file

Contact us

We are happy to help!

Contact